West of M6 Strategic Connectivity Study

image 1 image 2 image 3 image 4

West of M6 Strategic Connectivity Study

The West of M6 Connectivity Study has been undertaken on behalf of Cumbria Local Enterprise Partnership and Highways England.

The purpose of the study was to examine the issues and constraints associated with the strategic road connectivity of the Port of Workington, and the route capability, resilience and reliability of the A595, A590 and A66 to the west of the M6.

The report presents the results of the Option Assessment undertaken on schemes that have been prioritised for further development work. The prioritisation process and scheme assessment work is documented in this report along with details of the study approach, objective setting and the next steps for taking schemes forward.

To read the report go to West of M6 Strategic Connectivity Report

Cookie Policy

Our website uses cookies. By using our website and agreeing to this policy, you consent to our use of cookies.

Find out more about cookies.

cookieI ACCEPT